Project Description
GEMCO have recently completed installation of a range of new workshop equipment for Welsh Water, based in Ponthir.
The site’s workshop building has undergone major refurbishment and the new workshop and washbay are now ready for use.
Welsh Water has made major investments in ATF test lane equipment including a BM14200 commercial brake tester, Litecheck headlamp aligner and a 13m ATF steel inspection pit with side tunnels and LED lighting. This equipment will be used to service and pre-test Welsh Water’s fleet prior to the official test at their local DVSA ATF test station. In addition to the ATF equipment installed, GEMCO have also supplied and installed two Stenhoj two post lifts, workbenches, an exhaust extraction system, an Abac screw compressor with associated air pipe work and Samoa oil and lubrication tanks, drainers and pipework.
An Omer VEGA 24 tonne commercial vehicle lift has also been supplied and this is installed on the site’s external washbay. As this lift is fully galvanised, it is the perfect solution for exterior installation and washing of vehicles.