MOT Bay Installation at BT Boston Complete

2019-10-31T09:16:23+00:00

GEMCO have completed installation of a MOT Bay on site at BT Boston. All civil works, electrical works, installation and floor painting has been completed by our team at GEMCO. Equipment fitted includes; click on equipment for more information.  SHERPA BPSATL7 Class 7 Roller Brake Tester with tablet Sherpa Hydraulic Play Detector  Heavy duty steering [...]

AUTOPSTENHOJ Lift Installation Complete at Volvo Reading

2019-03-07T10:30:15+00:00

GEMCO have recently fitted a wide range of AUTOPSTENHOJ and Sherpa equipment at Volvo Reading, equipment fitted includes; AUTOPSTENHOJ Masterlift 2.35 Saa 230 Sport Lift AUTOPSTENHOJ Masterlfit 2.35 Pv Premium 160 - 220 with YX heads Lift AUTOPSTENHOJ Major 530-54 ATL/WA 5.2 tonne Lift Sherpa BPSATL4 Class 4 ATL RBT Brake Tester GEMJB28M 2.8 [...]