MOT Bay Installation at BT Boston Complete

2019-10-31T09:16:23+00:00

GEMCO have completed installation of a MOT Bay on site at BT Boston. All civil works, electrical works, installation and floor painting has been completed by our team at GEMCO. Equipment fitted includes; click on equipment for more information.  SHERPA BPSATL7 Class 7 Roller Brake Tester with tablet Sherpa Hydraulic Play Detector  Heavy duty steering [...]

Al-Ko Kober Ltd Brake Tester & Load Simulator Installation Complete

2017-08-21T13:01:17+00:00

Customer: Sometimes when using my Sherpa BPS Brake tester with hydraulic load simulation, the tag axle tyres bottom out on the workshop floor GEMCO Sales & Service: How about we cut out the floor and fit durbar plates to increase the gap and then fit post mounted emergency stops by the drivers door to isolate [...]

BT Carlisle Installation Complete

2017-05-22T16:02:53+00:00

GEMCO have recently completed an installation at BT in Carlisle. Equipment installed includes; AutopStenhoj Maestro 2.50FL Two Post Lift 009342 AUTOPSTENHOJ Major 6230 Service Four Post Lift Series (6.2 tonne) Sherpa BPSATL7 (ATL – One Man) Class 4 & 7 Brake Tester Omer KAR55 ATL Lift AUTOPSTENHOJ Maxi 200, 20 tonne with 7.5m platforms SHERPACOMBI Combined [...]