Quicklane Workshop Refurbishment at TrustFord Bristol Ashton Transit Centre

GEMCO recently completed a full workshop refurbishment at TrustFord Bristol Ashton Transit Centre, delivering a modern, future-ready facility within a six-week programme.

Designed to support EV PDI, servicing, repairs, and Class 4, 5L and 7 MOT testing, the project focused on improving technician workflow, compliance, and overall customer experience.

Workshop Refurbishment Scope

The existing three-bay workshop was transformed into a high-spec dry workshop, including:

  • Class 7 ATL bay upgrade for Class 4, 5L and 7 vehicles

  • New cast-in lift and brake tester recesses

  • Durable, non-slip epoxy flooring

  • Refreshed internal finishes

  • Full-length viewing windows from the reception area

Equipment Installation

To ensure reliable day-to-day performance, the workshop was equipped with:

  • 3 × AUTOPSTENHOJ Maestro 2-post 6T lifts

  • 1 × AUTOPSTENHOJ Major 4-post 5.2T ATL lift

  • Reinstalled Class 7 brake tester with new cabling

Bespoke Workshop Furniture

Custom workspace solutions from Truesteel Workspace Furniture were also installed, including lubrication cabinets, tool storage, mobile carts, and a dedicated MOT tester desk—supporting a clean, organised, and efficient workshop environment.

Future-Proofing Automotive Workshops

This project demonstrates GEMCO’s expertise in workshop design, refurbishment, and equipment installation, helping customers adapt to evolving vehicle technologies while maintaining efficiency and compliance.

Next
Next

ADAS now part of UK driving test