Quicklane Workshop Refurbishment at TrustFord Bristol Ashton Transit Centre
GEMCO recently completed a full workshop refurbishment at TrustFord Bristol Ashton Transit Centre, delivering a modern, future-ready facility within a six-week programme.
Designed to support EV PDI, servicing, repairs, and Class 4, 5L and 7 MOT testing, the project focused on improving technician workflow, compliance, and overall customer experience.
Workshop Refurbishment Scope
The existing three-bay workshop was transformed into a high-spec dry workshop, including:
Class 7 ATL bay upgrade for Class 4, 5L and 7 vehicles
New cast-in lift and brake tester recesses
Durable, non-slip epoxy flooring
Refreshed internal finishes
Full-length viewing windows from the reception area
Equipment Installation
To ensure reliable day-to-day performance, the workshop was equipped with:
3 × AUTOPSTENHOJ Maestro 2-post 6T lifts
1 × AUTOPSTENHOJ Major 4-post 5.2T ATL lift
Reinstalled Class 7 brake tester with new cabling
Bespoke Workshop Furniture
Custom workspace solutions from Truesteel Workspace Furniture were also installed, including lubrication cabinets, tool storage, mobile carts, and a dedicated MOT tester desk—supporting a clean, organised, and efficient workshop environment.
Future-Proofing Automotive Workshops
This project demonstrates GEMCO’s expertise in workshop design, refurbishment, and equipment installation, helping customers adapt to evolving vehicle technologies while maintaining efficiency and compliance.

